Swift Ops logoSwift OpsVideo to Intelligence
ROI calculator

Stop budgeting hours for typing work you already filmed.

Estimate how much standard work drafting time your team could recover when source video becomes a reviewable instruction package instead of a blank page.

Process video used to reduce standard work drafting time

Inputs

Volume
Docs per month
Baseline
Manual hours
Review
Human edit time
Output
Recovered time
Calculator

Use your own documentation load.

This is a directional planning tool. It estimates recovered drafting time, not a public price quote. Validate the result with one real process video.

Assumes Swift Ops prepares the first draft and your team still reviews, edits, and approves the result.

Estimated result

Recovered drafting time.

Monthly hours recovered
--
Annual hours recovered
--
Monthly labor value
--
Drafting time reduction
--

Adjust the inputs to estimate recovered drafting time.

Assumptions

The math only matters if the workflow is real.

Swift Ops should sell the fastest proof path: run one process video through Capture, review the generated package, and compare it against the manual drafting baseline.

InputWhat it meansHow to validate it
Documents per monthWork instructions, standard work packages, SOP updates, or training instructions your team authors.Use your last 30 to 90 days of documentation demand.
Manual hoursTime spent writing, screenshotting, formatting, and structuring the first usable draft.Ask the person who actually writes the document.
Review/edit hoursTime still needed for human correction, template fit, technical review, and approval.Measure it during a pilot. Do not assume zero review.
Labor rateLoaded hourly value for the people doing the drafting and review work.Use your internal planning rate.

Run the estimate, then test one process.

The calculator frames the opportunity. A pilot proves whether the generated package saves time on the work your team actually documents.